Documented outcomes
Real employers. Measured results.
Every case study below is based on documented data from a live customer engagement — not projections, not surveys. MSD absence days counted, cost savings calculated, results published.
Industrial services · Finland · 60 employees
Pa-Hu: 487 fewer MSD absence days in one year
A systematic, two-year programme of biomechanical analysis, task-specific coaching, and continuous monitoring produced one of the clearest documented ROI cases in Nordic occupational health.
487
Fewer MSD sick leave days compared to the prior year
40%
Reduction in MSD-related absences year-on-year
€170–230k
Documented annual savings (at €350–470 per absence day)
Pa-Hu is a Finnish industrial services company with around 60 employees engaged in physically demanding work. MSD-related sick leave had been a persistent cost and operational challenge. In 2024, the company recorded 1,265 MSD absence days. By the end of 2025, following a structured TE3 programme, that figure had fallen to 778 days.
The programme focused on three interconnected workstreams: regular biomechanical mobility analyses for all employees (twice per year), task-specific ergonomic analysis and coaching for the most physically demanding roles, and a company-specific exercise programme — the Pa-Hu Reeni — built directly from the aggregated mobility and task data.
When biomechanical risk factors are identified and addressed systematically, the results compound over time. Fewer short absences. Fewer long-term cases. More predictable production. Less management burden on supervisors handling replacement staffing.
“The results are clear reading. What is especially impressive is how significantly the pain and tension states of our personnel decreased.”
HR Manager, Pa-Hu
The collaboration continues. Preventive workforce mobility management is now an embedded part of Pa-Hu’s occupational health approach rather than a one-off project.
Industrial services · Logistics · Finland
Logistics · Finland · 20 employees
HUB Logistics: MSD absences reduced by 92% — from 123 days to 10
A single logistics unit that had seen MSD absences surge turned the trend completely around within one programme cycle — and sustained the result for two consecutive years.
92%
Reduction in MSD absence days at the Tampere unit
123→10
MSD days in the measured period, before and after
>€40k
Documented savings — sustained over two years
HUB Logistics’ Tampere site began working with TE3 in spring 2023, when MSD-related absences had been rising sharply. In the six months prior to the programme, the 20-person unit accumulated 123 MSD absence days — a significant operational burden for a small team.
Following the TE3 intervention, autumn 2023 MSD absences fell to zero. In 2024, the full year produced just 10 absence days. The result has held across two consecutive measurement periods — confirming this is a sustained behavioural and physical change, not a short-term effect.
“It has been wonderful to see the long-term impact of the TE3 service. The personal mobility analyses, task analyses, habit modification and shared exercise sessions form a functioning whole. This is the key through which companies achieve significant savings and employees feel and perform better.”
Jarkko Kortelainen, CCO, TE3
“The results of our project aimed at reducing MSD absences have been long-lasting. Absence numbers have remained low — and if they were to deteriorate again, we now have considerably more tools to address it than we did before.”
Unit Manager, HUB Logistics Tampere
Logistics · Warehousing · Finland
Customer base
Active across industrial sectors
TE3 currently serves 10 customers across physically demanding industrial environments in Finland, with Sweden expansion underway.
Heavy maintenance
Vehicle servicing, equipment maintenance
Logistics & warehousing
Distribution, fulfilment, freight
Food production
Processing, packaging, production lines
Installation & construction
On-site technical installation, building
Manufacturing
Assembly, process industry, production
Retail & services
Physical retail, customer-facing operations
Infrastructure
Civil engineering, site operations
Your sector?
